NYDAC was asked to pick up Tree from Redbull Creation Event and install the Galvanized Tree in its recording studio. Here is a photo of the Tree installed.
New York Design and Construction
NYDAC was asked to pick up Tree from Redbull Creation Event and install the Galvanized Tree in its recording studio. Here is a photo of the Tree installed.
NYDAC was on the build out team for the new Redbull Music Academy. Here are some photos of the build out.
Here are some photos of the install. [flickr-gallery mode=”photoset” photoset=”72157633155440526″] Here a video of the event. Track Cycling in a Cathedral – New York – 2013 by Riders-Match
Read more here. http://www.redbullusa.com/cs/Satellite/en_US/Article/f1-car-lincoln-tunnel-021243246869343
More Photos Here.
New York Design and Construction was contracted to build new walls and install new Fixtures. All Fixtures were designed by Vans Architect Michael Hurst.