Redbull Creation Event.

NYDAC was asked to pick up Tree from Redbull Creation Event and install the Galvanized Tree in its recording studio. Here is a photo of the Tree installed.

Redbull Music Academy Build out

NYDAC was on the build out team for the new Redbull Music Academy. Here are some photos of the build out.  

Hardwood floor install time lapse

Redbull Mini Drome Installed at Bushwich Church by NYDAC

Here are some photos of the install. [flickr-gallery mode=”photoset” photoset=”72157633155440526″] Here a video of the event. Track Cycling in a Cathedral – New York – 2013 by Riders-Match

Video by 5050 Skatepark of us building a new ramp.

Sign NYDAC built and Danny Renda Hand painted for Native Coffee Roasters

Redbull Winter Jam Ramp by NYDAC

REDBULL F1 CAR TEARS THROUGH NYC’S LINCOLN TUNNEL. NYDAC was contracted to weld the manhole covers for Redbull.

Read more here. http://www.redbullusa.com/cs/Satellite/en_US/Article/f1-car-lincoln-tunnel-021243246869343

NYDAC builds indoor Skatepark on Staten Island.

More Photos Here.

DQM Vans General Store Basement gets new Fixtures

New York Design and Construction was contracted to build new walls and install new Fixtures. All Fixtures were designed by Vans Architect Michael Hurst.